Building construction

Winery expansion, steel frame

Production hall added to a working winery

Sofia Márquez

€1,400

Reference only Study and reference. Not for construction. What this means

Sign in to buy

Sign in to save this work

Production hall added to a working winery.

Layers and line weights follow the office standard the drawings were made in, and the key is included.

The set is the stage it reached before the project stopped, so it is complete in itself but not built.

Format
PDF
Size
0.0 MB
Fingerprinted
2026-08-03
SHA-256
75656b17417db6916e92e608bd5a4b5769cd05f6e5c972bb1459690ddfca5099

Architra hashes every upload once, when it arrives. Anyone holding the file can calculate the same digest and compare it with the SHA-256 above: a buyer checks that the download is the file this page describes, and the author has a dated record that it was here under their account.

This work is mine and should not be here

Tell us who you are and how this drawing is yours. If the claim holds, the work comes off the marketplace.